complete public area refurbishment

Pure Gym

Pure Gym

Project: Pure Gym Oval refurbishment

Contract period – 7 Weeks

A complete public area refurbishment which included the installation of one of the UK’s first purely digital studios, allowing for virtual specialist classes on demand. We created zoned areas for different exercises using heavy metal cages to maintain the industrial feel of the building and ensuring air conditioning and fresh air flow to these areas. The gym was totally redecorated with new floor finishes and signage. We worked sensitively and flexibly, phasing the works to enable the gym to remain open to the public during the refurbishment.

Project: Pure Gym Bravington House, London HQ

Contract period – 8 Weeks

Complete fit out of the prestigious new Pure Gym London HQ office within the heart of the Kings Cross regeneration area. This contemporary open plan office required formation of new individual offices for the CEO and FD together with new boardroom, meeting rooms, and quiet rooms. We also installed break out areas, staff facilities and adapted the M&E to suit the new layout. Our attention to detail ensured the Caulder Moore design with its feature walls and lighting was delivered to the most exacting standards.